Annular velocity
Fluid velocity in the annulus, used to check hole cleaning.
AV = 24.51 × Q ÷ (Dh² − Dp²)
Fluid velocity in the annulus, used to check hole cleaning.
AV = 24.51 × Q ÷ (Dh² − Dp²)
Pressure of a static fluid column at a true vertical depth.
P = 0.052 × MW × TVD
Effective mud weight while circulating, including annular pressure loss.
ECD = MW + APL ÷ (0.052 × TVD)
Mud weight needed to balance formation pressure after a kick, from shut-in drillpipe pressure.
KMW = MW + SIDPP ÷ (0.052 × TVD)
Maximum allowable annular surface pressure before the casing shoe fractures.
MAASP = (LOT EMW − MW) × 0.052 × Shoe TVD
Curvature between two survey stations, by the minimum curvature method.
DL = acos[cos(I₂−I₁) − sinI₁·sinI₂·(1 − cos(A₂−A₁))] DLS = DL × 100 ÷ ΔMD
Nozzle flow area, pressure drop across the bit, hydraulic horsepower and HSI.
TFA = n × π/4 × (size/32)² ΔP = MW × Q² ÷ (12,031 × TFA²) · HHP = ΔP × Q ÷ 1,714
Energy to remove a unit volume of rock (Teale). Rising MSE flags inefficient drilling or dysfunction.
MSE = 4·WOB ÷ (π·D²) + 480·T·RPM ÷ (D²·ROP) (WOB lbf, T ft-lb, D in, ROP ft/h)
Pump output per stroke and flow rate from liner size, stroke length and SPM.
bbl/stk = 0.000243 × Liner² × Stroke × Eff gpm = bbl/stk × 42 × SPM
Volume per foot inside the pipe and in the annulus, for mud and cement volumes.
Capacity = ID² ÷ 1,029.4 · Annulus = (Dh² − Dp²) ÷ 1,029.4
Converts air weight of a string to its weight in mud, for hook load and torque & drag.
BF = 1 − MW ÷ 65.5 (steel)
Bottomhole ISIP and fracture gradient from surface ISIP at the end of a stage.
BH ISIP = ISIP + 0.052 × ρ × TVD FG = BH ISIP ÷ TVD
Pressure at the perforations while pumping, from surface treating pressure.
BHTP = STP + 0.052 × ρ × TVD − ΔP pipe − ΔP perf
Hydraulic horsepower needed at a given treating pressure and pump rate.
HHP = P × Q (bpm) ÷ 40.8
Pressure drop across the perforations, used to check limited-entry designs.
ΔPpf = 0.2369 × Q² × ρ ÷ (N² × D⁴ × Cd²)
Total proppant pumped and proppant intensity from clean volume and average concentration.
Proppant = Clean bbl × 42 × ppa Intensity = Proppant ÷ Stage length
Volume to displace the wellbore to the top perforation.
Flush = ID² ÷ 1,029.4 × MD
Fluid density needed to hold reservoir pressure during a workover, with overbalance.
KWF = (Pres + Overbalance) ÷ (0.052 × TVD)
Estimated length of free pipe above the stuck point, from stretch under a differential pull.
L = 735,294 × e × W ÷ F (steel)
Elastic stretch of a tubing or pipe string under tension.
ΔL = F × L × 12 ÷ (E × As), E = 30,000,000 psi
Well deliverability per psi of drawdown.
PI = Q ÷ (Pres − Pwf)
Flowing or static bottomhole pressure from an acoustic fluid level shot.
BHP = Pcsg + (Perf depth − Fluid level) × Gradient
Theoretical and effective rate for a sucker rod pump.
PD = 0.1166 × S × SPM × D²
Water cut, total fluid and gas-oil ratio from a well test.
WC = W ÷ (O + W) · GOR = Gas × 1,000 ÷ Oil
Calculations are for quick checks only and use oilfield units and common field constants. Verify critical values, especially well control and frac design, with full engineering software and your company's procedures.