Drilling

Annular velocity

Fluid velocity in the annulus, used to check hole cleaning.

Annular velocity
237.7 ft/min

AV = 24.51 × Q ÷ (Dh² − Dp²)

Hydrostatic pressure

Pressure of a static fluid column at a true vertical depth.

Pressure
5,200 psi
Gradient
0.520 psi/ft

P = 0.052 × MW × TVD

Equivalent circulating density (ECD)

Effective mud weight while circulating, including annular pressure loss.

ECD
10.58 ppg

ECD = MW + APL ÷ (0.052 × TVD)

Kill mud weight

Mud weight needed to balance formation pressure after a kick, from shut-in drillpipe pressure.

Kill mud weight
10.77 ppg
Formation pressure
5,600 psi

KMW = MW + SIDPP ÷ (0.052 × TVD)

MAASP

Maximum allowable annular surface pressure before the casing shoe fractures.

MAASP
1,404 psi

MAASP = (LOT EMW − MW) × 0.052 × Shoe TVD

Dogleg severity (DLS)

Curvature between two survey stations, by the minimum curvature method.

DLS
3.16 °/100 ft
Dogleg
3.16 °

DL = acos[cos(I₂−I₁) − sinI₁·sinI₂·(1 − cos(A₂−A₁))] DLS = DL × 100 ÷ ΔMD

Bit hydraulics

Nozzle flow area, pressure drop across the bit, hydraulic horsepower and HSI.

TFA
1.178 in²
Bit ΔP
150 psi
HHP
44 hp
HSI
0.73 hp/in²

TFA = n × π/4 × (size/32)² ΔP = MW × Q² ÷ (12,031 × TFA²) · HHP = ΔP × Q ÷ 1,714

Mechanical specific energy (MSE)

Energy to remove a unit volume of rock (Teale). Rising MSE flags inefficient drilling or dysfunction.

MSE
60.6 ksi

MSE = 4·WOB ÷ (π·D²) + 480·T·RPM ÷ (D²·ROP) (WOB lbf, T ft-lb, D in, ROP ft/h)

Triplex pump output

Pump output per stroke and flow rate from liner size, stroke length and SPM.

Output
0.0997 bbl/stk
Flow rate
419 gpm

bbl/stk = 0.000243 × Liner² × Stroke × Eff gpm = bbl/stk × 42 × SPM

Pipe and annular capacity

Volume per foot inside the pipe and in the annulus, for mud and cement volumes.

Pipe
0.0178 bbl/ft
Annulus
0.0501 bbl/ft

Capacity = ID² ÷ 1,029.4 · Annulus = (Dh² − Dp²) ÷ 1,029.4

Buoyancy factor

Converts air weight of a string to its weight in mud, for hook load and torque & drag.

Buoyancy factor
0.847
Buoyed weight
169.5 klb

BF = 1 − MW ÷ 65.5 (steel)

Completions

Fracture gradient from ISIP

Bottomhole ISIP and fracture gradient from surface ISIP at the end of a stage.

BH ISIP
8,650 psi
Frac gradient
0.910 psi/ft

BH ISIP = ISIP + 0.052 × ρ × TVD FG = BH ISIP ÷ TVD

Bottomhole treating pressure

Pressure at the perforations while pumping, from surface treating pressure.

BHTP
9,848 psi

BHTP = STP + 0.052 × ρ × TVD − ΔP pipe − ΔP perf

Frac hydraulic horsepower

Hydraulic horsepower needed at a given treating pressure and pump rate.

Hydraulic HP
18,750 hhp

HHP = P × Q (bpm) ÷ 40.8

Perforation friction

Pressure drop across the perforations, used to check limited-entry designs.

Perf friction
344 psi
Rate per perf
1.50 bpm

ΔPpf = 0.2369 × Q² × ρ ÷ (N² × D⁴ × Cd²)

Proppant per stage

Total proppant pumped and proppant intensity from clean volume and average concentration.

Proppant
420,000 lb
Intensity
2,100 lb/ft

Proppant = Clean bbl × 42 × ppa Intensity = Proppant ÷ Stage length

Flush volume

Volume to displace the wellbore to the top perforation.

Flush volume
399 bbl

Flush = ID² ÷ 1,029.4 × MD

Production and workover

Workover kill fluid weight

Fluid density needed to hold reservoir pressure during a workover, with overbalance.

Kill fluid
8.17 ppg

KWF = (Pres + Overbalance) ÷ (0.052 × TVD)

Free point (stuck pipe)

Estimated length of free pipe above the stuck point, from stretch under a differential pull.

Free pipe
5,493 ft

L = 735,294 × e × W ÷ F (steel)

Tubing stretch

Elastic stretch of a tubing or pipe string under tension.

Stretch
53.0 in
Steel area
1.812 in²

ΔL = F × L × 12 ÷ (E × As), E = 30,000,000 psi

Productivity index

Well deliverability per psi of drawdown.

PI
0.200 bbl/d/psi
Drawdown
2,000 psi

PI = Q ÷ (Pres − Pwf)

BHP from fluid level

Flowing or static bottomhole pressure from an acoustic fluid level shot.

Bottomhole pressure
620 psi
Fluid above perfs
1,500 ft

BHP = Pcsg + (Perf depth − Fluid level) × Gradient

Rod pump displacement

Theoretical and effective rate for a sucker rod pump.

Displacement
411 bbl/d
Effective
329 bbl/d

PD = 0.1166 × S × SPM × D²

Water cut and GOR

Water cut, total fluid and gas-oil ratio from a well test.

Water cut
75.0 %
Total fluid
1,000 bbl/d
GOR
1,600 scf/bbl

WC = W ÷ (O + W) · GOR = Gas × 1,000 ÷ Oil

Calculations are for quick checks only and use oilfield units and common field constants. Verify critical values, especially well control and frac design, with full engineering software and your company's procedures.

Run these on live data

AI Driller calculates hydraulics, ECD, torque & drag, MSE, frac pressures and more in real time from your rigs, frac fleets and workover rigs. AI Spaces is free to start.

Run these on live data

AI Driller calculates hydraulics, ECD, torque & drag, MSE, frac pressures and more in real time from your rigs, frac fleets and workover rigs. AI Spaces is free to start.